Speedier construction through frame standardisation

seismic_launch__3_big

The Seismic consortium has engineered a standardised frame solution for schools that claims to be 75% faster than traditional construction

seismic_launch__3_big

A demonstrator has been assembled at BRE Innovation Park in Hertfordshire, with the modules and roof cassettes assembled in three different factories

For all the talk about the benefits and the pressures to change, the industry is still reluctant to adopt modern methods of construction (MMC). There are good reasons for this.

MMC迫使客户尽早做出决策,将客户锁定在以后更改困难且昂贵的设计中;非现场解决方案往往来自相对不知名的供应商;生意失败可能会让客户陷入困境,因为他们的计划和预算都泡汤了。

There are concerns too about the fire and structural performance of new and untested systems; the cyclical nature of the industry combined with a desire for bespoke designs means manufacturers do not benefit from a regular pipeline of work, leaving expensive production capacity underused and pushing up costs above those of traditional construction.

This is premium content.

Only logged in subscribers have access to it.

Login or世界杯乌拉圭vs韩国即时走地to view this story

Gated access promo

Existing subscriber?LOGIN

A subscription to Building Design will provide:

  • Unlimited architecturenewsfrom around the UK
  • Reviewsof the latest buildings from all corners of the world
  • Full accessto all our online archives
  • PLUS you will receive a digital copy ofWA100 worth over £45.

世界杯乌拉圭vs韩国即时走地now for unlimited access.

AlternativelyREGISTERfor free access on selected stories and sign up for email alerts